BESS & RES

Battery storage
and RES projects
turnkey.

We deliver complete tailor-made energy solutions, from the initial engineering design to connection to the 400 kV grid and subsequent operational service. We ensure maximum efficiency and stability of your energy system.

Scroll down ↓
Our solutions

Complete integration
with a capacity from 1.0 MW.

We specialise in delivering large-capacity battery systems and RES projects that push the boundaries of modern energy. Our engineering resources allow us to deliver projects of any scale, with solutions typically supplied from 1.0 MW.

We approach every project as a unique whole. Thanks to many years of experience integrating complex systems, we ensure that your storage system is fully compatible with your business model and the specific requirements of your site or distribution grid.

1.0 MW+
Standard system power Scalable to project requirements
01
Battery systems (BESS)
Large-capacity battery storage for industry, grid applications and hybrid power plants. Full integration with the DSO/TSO.
02
Renewable energy sources (PV/wind)
We deliver RES projects as EPC contracts, specialising in grid connection of output and connection to the distribution and transmission system (HV/EHV).
03
Hybrid energy systems
A combination of BESS + PV + backup sources with a controlled DC/AC architecture for maximum autonomy.
04
Grid connection from 22 kV to 400 kV
Complete EPC for connection to the distribution and transmission system level, including transformation and protection.
1.0 MW Standard power from
400 kV Grid connection
24/7 Operational monitoring
EPC Complete delivery
Why work with us

From design to
full operation.

We are not just technology suppliers. We are your partners for energy self-sufficiency and stability. Our work covers the entire project life cycle.

01
Phase 01
Engineering
& Design

We define the system parameters so that they match your operational and economic goals.

  • Technical and economic study
  • DC/AC system architecture
  • Design of protection and control systems
  • Coordination with DSO/TSO
02
Phase 02
EPC
Timeline

We take full responsibility for the project — from the DC architecture to the final connection to the 400 kV grid.

  • Turnkey construction
  • Supply of BESS / PV technology
  • Cable routes and busbars
  • HV/EHV 400 kV connection
03
Phase 03
Testing &
Commissioning

We carry out complete factory acceptance tests (FAT) so that on-site installation is fast, safe and immediately functional.

  • FAT at the system manufacturer
  • On-site integration tests (SAT)
  • SCADA and BMS configuration
  • Handover protocol
04
Phase 04
Monitoring
& Service

We actively monitor your system 24/7. Thanks to our diagnostics we prevent outages and ensure maximum performance and a long service life of your investment.

  • Remote SCADA monitoring 24/7
  • Predictive diagnostics
  • Service response within 24 h
  • Optimisation of performance and service life
Cooperation

Ready to start
your project?

Contact us to discuss cooperation. We deliver projects in the Czech Republic and abroad.